Thursday there was some progress framing and insulating the new crawl space floor. This was held up a little because the HVAC guys said they want to plumb for the relocated radiator location and that would be easier to do before the insulation gets attached to the bottom of the floor joists.
In other news, we moved the camera outside to the cherry tree and started filming from there. You can see Craig burying the extension cord that powers the camera in the background of the movie.
We need to make some exposure adjustments and see if we can add a wide angle lens adaptor to the setup, but the footage wasn’t too bad for a first try.
-
how to mount a camera on a tree -
floor joists






