End of the day Monday

After the pizza was eaten and more work done, the dumpster is full and here’s where we stand:

Pizza Monday

We made pizza on the grill for the guys today. Yum.  …. and, while they guys weren’t eating pizza, the foundation wall  was built and the roof overhangs on the east side were cut off. Yay.

First half of the foundation wall
Second half of the foundation wall

The back porch overhang

The back porch roof has been removed. I guess we will no longer be sheltered from the sun or rain when using the little out door grill.

Knocking down the back porch roof

Siding removal

Jim starts pulling the siding from the north side of the house, where the bump out will happen and also from the current roof overhangs.  Much of this siding is 1″ thick, clear, aromatic, cedar.

 

Pulling siding
HW salvaging siding (pulling nails, ugh)

Prepared for construction

Our oil fill pipes, air conditioner compressor and propane tank have all been removed from the north side of the house… we are ready for work to begin.

Ready to begin
HW & CDM dig up the old coax line